§ 14.2. Permit procedure.  


Latest version.
  • 14.2-1

    Permit requirement.

    a.

    Development permit. A development permit shall be required for any proposed use of land or planned development in the PUD or PID district; planned shopping, office or industrial center in any commercial or other industrial district providing shared parking, access, and service to three or more business establishments, single-family attached, cluster, or multi-family residential development; manufactured home park or subdivision before any improvements or grading of the land commences. Such development permits shall not be in lieu of building permits required for any structure within such developments.

    b.

    Building permit. A building permit shall be required for any proposed use of lands or building to indicate and insure compliance with all provisions of this ordinance before any construction or building commences.

    c.

    Manufactured home location permit. A manufactured home location permit is required for any person to commence the excavation for or construction of a manufactured home stand or the placement of manufactured home on an individual lot within a manufactured home park.

    d.

    Temporary certificates. The building official is authorized to issue a permit for temporary occupancy in addition to a permit for erection, alteration, moving, or repair of a structure provided the permit shall not exceed six months and shall include such conditions and safeguards as will protect the safety of the occupants and the public.

    14.2-2

    Permit application.

    a.

    Development permit. An application for a development permit shall be made to the zoning administrator and shall be accompanied by complete plans in duplicate signed by the author with his address, drawn to scale, showing the actual shape and dimensions of the lot to be built upon, the exact sizes and locations on the lot of the buildings and accessory buildings then existing, and the lines within which the proposed building or structure shall be erected or altered, the proposed building or structure which shall be erected or altered, the existing or intended use of each building or part of a building, the number of families or housekeeping units the building is designed to accommodate, and such other information with regard to the lot and neighboring lots as may be necessary to determine and provide for the enforcement of this ordinance. One copy of such plans shall be returned to the owner when such plans have been approved. Approval of a preliminary plat in accordance with all applicable provisions of the subdivision regulations and approval of site plans as required in article 18: amendment and zoning procedures shall constitute approval of the development permit for such subdivision or development.

    b.

    Building permit. A building permit shall be required for any proposed use of lands or building to indicate and insure compliance with all provisions of this ordinance.

    c.

    Manufactured and mobile home location permit. Manufactured and mobile homes are subject to permitting requirements the same, as building permits.